Start a task or continue recent work.
Commissioning / TAB
Compare design intent with measured performance, diagnose deviations and retest after adjustment.
Use this Work Mode inside a real Project
See role-relevant attention, actions, evidence and connected context without learning the module structure.
What do you want to do now?
Choose one action. You do not need to understand the rest of HVACR Studio before starting.
Run equipment commissioning packs, air balance and hydronic balance.
Start →PROFESSIONALCheck acceptance criteriaReview measured values against explicit project criteria.
Start →PROFESSIONALOpen the Project recordWork from the approved equipment and evidence context.
Start →Typical work in this mode
- Run equipment commissioning packs
- Complete evidence-linked functional checklists
- Air balance
- Hydronic water balance
- Review deviations and retests
- Generate professional TAB reports
Common problems you may be solving
- Branch airflow imbalance
- AHU airflow below design
- Water flow imbalance
- Pump or fan performance deviation
Commissioning + Airside/Hydronic TAB depth
Studio connects versioned equipment commissioning packs, calibrated instrument traceability, Engineering Evidence, approved design criteria, air/water balancing, retest history and frozen professional reports into one project workflow.
Open Commissioning & TAB →Useful calculators & references
Use these for fast checks without changing the Project record.
Need full traceability?
Professional workflows connect the job to the Project and equipment so readings, evidence, issues, corrective actions, verification and reports stay together.
Coming later for this mode
These are planned enhancements, not features required to use the current workflow.
- Multi-party digital witness workflow
- Commissioning programme scheduling
- Pack-completeness analytics
- Cross-project performance benchmarking